01/

  • Semi or Fully automated

  • Single or Dual brush

  • Height adjustment of main rotary brush

  • Cleaning speed  :  < 0.25 m/sec.

  • Good gap & distance tolerance, misalignment overcoming design

  • Working time :  <= 1.5 ~ 2 hrs./battery     * Long duration battery applicable   

  • Switchable( shiftable ) or permanently installable      ​

  • Battery self-charging unit (optional)

  • Dry (water free) cleaning 

  • Wet (water) cleaning 

  • Water consumption : approximately 0.2 (L)/ m²

  • Gradability : < 20 %

  • Tilt angle : < 60 °

  • Automatic one way or round cleaning trip

  • Start / stop by sensors

  • Removable / Rechargeable lithium series battery

  • Removable handles

  • Remote controlled / button panel / wireless control / centralized control

  • Emergency button

  • Battery indicator

Performance and Operation

02/

  • NEMA -4X level

  • Anti-rust design

  • Heat resistant design  

  • Dust & sand resistant design : Desert proof

  • Rain proof design 

  • Wind resistant design 

  • ​Anti-corrosion design

Weather Proof

03/

  • Max. design size :  <= 30-m wide solar array  * Regardless of length of single solar array

  • Width : 500 ~ 1,500 mm  *  1-m ~ 30-m wide solar array 

  •          *  depending on customized options and array width

  • Weight : approximately        kg ~      *  1-m ~ 30-m wide solar array 

  • Weight distribution design

  • Painted aluminum covers

  • Easy brush change

  • Low maintenance

Dimensions/ Weight/ Mechanics

04/

  • Lithium series 

  • Rechargeable / Removable 

  • Heat protection

  • Cycle : < 1,500 ~ 2,000 * depending on frequency of use and conditions

  • Battery indicator 

  • Weight : approximately 3.5 Kg ~  * depending on battery capacity applicable

Battery

05/

  • Small customization

  • Medium customization

  • Mass customization

Production  

* Specifications and pricing can be different from the real

depending on environmental or engineering design conditions.

Switchable use / Permanently installable use

Solmaks E

  1. ShiftabIe - with man-power requirement

  2. The appropriate number of Solmaks E units is installed permanently being moved by a automatic delivery cart(s)

  3. Solmaks E units are installed permanently on every solar array

Case - 1

- No station structures and No rail tracks

Case - 2

- Station structures and No rail tracks

- Solmaks doesn't require station structure at reverse side

Case - 3

- Station structures and Rail tracks

- Solmaks doesn't require station structure at reverse side

INTEGRA GLOBAL Co., Ltd. - Est. 2006 & 2012 
  • 88-21, Saneop-ro 156beon-gil, Gosaek-dong, Gwonseon-gu, Suwon-shi, Gyeonggi-do, Korea, Rep. 16648
  • 98 ChaAhm-dong, CheonAhn-shi, Choongnam, Korea,Rep. 330-200
2018 Copyright © INTEGRA GLOBAL CO., LTD.  Images, photographs on the website produced by Integra Global or purchased from Fotolia.com